Civil Works, Joint bays install for a new 33 and 11Kv feeders within the Argenton region of Newcastle. Works within green field and brown field sites.

Works Included:

  • 3.8klms of trench and conduit
  • Arrange all traffic management plans, RTA Permits and on site traffic control for duration of entire project
  • Excavate trench and install conduits.
  • Backfill with TSB (Thermally Stable Backfill)
  • Temporary Restoration

This project was completed for Ausgrid.